Talk Back
Post a CommentHousingZone Most Popular Stories
- Home Mortgage Rates Set to Move Higher Next Spring
- Tax Credit Extension to Give Housing Recovery a Boost
- Design Challenge Winners Tackle the Multigenerational Household
- The Energetic Discipline Behind Professional Builder's Builder of the Year
- What remodelers need to know about the new lead paint rules
- Remodelers Tighten Up Labor Costs to Stay Afloat
- Use abandoned phone numbers to boost remodeling business
- What Today's First-Time Buyers Want in a New Home
- 100 Best New Products 2009
- Remodeling market down, but remodelers expect recovery
Platinum Winner: Outdoor Living
Outdoor Luxury
Jonathan Sweet, Senior Editor
December 1, 2008
Professional Remodeler
Remodeler: Lewis Aquatech Chantilly, Va.
Outdoor Luxury



With a historic Frank Lloyd Wright home next door, a steep slope and the water nearby, reaching this site proved to be the biggest challenge for Lewis Aquatech in crafting this two-level, luxurious outdoor retreat along the Potomac River.
After photos by Morgan Inc.
The owner of this 46,000-square-foot home in suburban Virginia wanted to create an incredible outdoor space and enhance his stunning view of the Potomac River. With a steep slope from the river to the home 200 feet above and a site with limited access, Lewis Aquatech was facing a tough challenge.
Luckily, the company had recently completed a project in a similar setting only a block away. That experience impressed the owner and landed the job for Lewis Aquatech.
The homeowner wanted to have two terraces, with a top level featuring a small deck with a pool and a bottom level for entertaining large groups. On the upper terrace, Lewis Aquatech installed an infinity pool so the pool would blend directly into the view of the Potomac. French limestone was chosen for the decks and walls because its light color would keep it cooler underfoot during the summer. To make the terraces usable year-round, the company installed an intricate network of snow-melt systems.
“There was no way to drive to the left- or right-hand side of the house because of existing structures that were present and historic structures that were present,” says Principal Don Gwiz. “The logistics of scheduling all this was our biggest challenge.”
At the same time, the company was facing an aggressive timeline, with the owner wanting the project completed as quickly as possible.
“With all that, if we didn't have a well-organized site and didn't pre-plan, we never would have made this work,” Gwiz says.
© 2009, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.










Digg This