SEER 2003/2004: A REMODELING RESEARCH INITIATIVE
Construction Pictures - November 2002 (Click on each picture to view a larger version.) |
 Roofing and sheathing were removed and replaced on all roof surfaces. Thirty-year asphalt dimensional shingles were used. Windows are next to be installed to complete the enclosure process. |
 |
 |
|
 |
 |
 The roof has been completed and the windows installed. |
|
 |
 The old porch's stone foundation was in poor shape and required removal. The deck material (under the green tarp) awaits township approval (front-yard setback variance was granted) to replace the deck in its entirety instead of repairing the existing deck. |
 A millrace was excavated next to the house in the late 1700s and used for water power to a saw- and gristmill. |
|
 |
|
|
|
|
|