|
|
SEER 2003/2004: A REMODELING RESEARCH INITIATIVE
Construction Pictures - March 2003 (Click on each picture to view a larger version.) |
 The cupola was refurbished with new wood, windows, a copper roof and fresh paint. |
 A crane was rented to replace the cupola after it was refurbished and painted. |
 The cupola is lifted into position by a 120-foot crane after the re-roof was completed. |
|
 The finished cupola after it was completely rehabilitated and lifted back onto the barn. |
 After major voids were filled, a skim coat of cement was applied to the exterior foundation walls, and faux decorative limestone was struck, creating a more authentic Victorian appearance. |
 |
|
 |
|
|
|
|
|