Talk Back
Post a Comment
|
||||||||||
HousingZone Most Popular Stories
- International Residential Codes Available Online
- Growing your remodeling business in the current economy
- 2008 Remodeler of the Year
- Develop Land Or Buy Lots? Home Builders Face Dilemma
- ProBuilder Product Report: Kitchen Appliances
- What Can You Recycle?
- A smaller home can still be beautiful
- Wood vs. Engineered Lumber
- Myths and Facts About Automatic Fire Sprinklers
- How to Use Percentage-of-Completion Accounting
Erosion Controls Hit Smaller Sites
Jeff Griffin, Construction Equipment contributing editor
October 1, 2003
Professional Builder
![]() |
"Phase II means almost every construction site today needs an NPDES permit," says environmental scientist Shirley Morrow of engineering firm Burns & McDonnell in Kansas City, Mo.
Previously unregulated projects now might require an erosion and sediment control plan, a state NPDES permit and, if the site lies in a jurisdiction with a population of 10,000 or more, a local permit. Regulations vary greatly from state to state and can differ from one township to the next.
To determine a project’s requirements, Morrow recommends checking with the appropriate state agency, usually the department that regulates environmental quality. Then find out if Phase II applies in the area. Public works or utilities departments often handle municipal permits.
"Phase II is so new, not many ordinances are in place," Morrow says. But more and more cities and counties are putting programs together. “There are many more inspectors checking projects and more citizens complaining, which results in more rigid inspections. If you weren’t obtaining the proper permits and preparing storm-water plans before, you'd better do it now."
Penalties for violations can range from a few hundred dollars to more substantial amounts and an order to stop work.
© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.


Digg This
