Top Ten Feature: 10 Steps to Adopt Lean Building

Step 7: Move upstream to lean plans

After launching a serious Lean implementation journey, at some point it will occur to you that a significant percentage of the issues your suppliers, trades, and employees identify could be avoided by paying serious attention to plans and product specifications up front. In the ideal world, that’s where you’d begin, but there’s a problem with that: Until you hold the event and show them the money as described in steps 3 and 4, very few architects, designers, engineers, or managers accept the magnitude of the problem.

An additional obstacle is when you begin with plans you often don’t surface the critical process issues that loom as obstacles, no matter how good the plans are. At the end of the day, practicality rules. Moving upstream pays off enormously in Lean, but experience says don’t lead with it.



1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10 

 
 

Comments on: "Top Ten Feature: 10 Steps to Adopt Lean Building"



 

See all videos

Search Our Buyer's Guide

Reference Library

Professional Remodeler’s annual Market Leaders list, which identifies the top...

Using the kitchen as a social space is just one of Professional Remodeler's Top

With demand for custom design, remodeling, and renovations at its highest level since 2005, ...

A 78-inch long, 36-inch high island outfitted with granite countertop and built-

Normandy Remodeling converts confined kitchen into sprawling galley.

Each year, the National Kitchen and Bath Association surveys its members to identify the latest...

Each year, the National Kitchen and Bath Association surveys its members to identify the latest...